Płock 04
Construction
- post: Ø60.3 mm tube
- crossbar: Ø30 mm tube
- upon request, the crossbar can be profiled into arcs that match the natural curves of the installation site
- as standard, the upper part of the post is secured with a plastic cap; four shapes of aluminum decorations are also available as an option (11.11, 12.12, 13.13, 14.14)

Finishing options
- galvanized + powder coating in a selected color from the RAL palette
Installation
- by concreting the legs into a concrete foundation
- using double-strut steel anchors (for use only in hard and solid ground) – this form of installation is not permitted
Category: Bariers
Polished stainless steel stands - up to 4 weeks from production acceptance/payment of the proforma.
Galvanized stands - up to 5 weeks from production acceptance/payment of the proforma.
Galvanized and painted stands - up to 6 weeks from production acceptance/payment of the proforma.

Related products
-

Wrocław 02
676.50 zł – 984.00 złPrice range: 676.50 zł through 984.00 zł Brutto | 550.00 zł NettoSelect options This product has multiple variants. The options may be chosen on the product page -

03 Plock Barier
738.00 zł – 836.40 złPrice range: 738.00 zł through 836.40 zł Brutto | 600.00 zł NettoSelect options This product has multiple variants. The options may be chosen on the product page -

Plock 02 Barier
1,414.50 zł – 1,599.00 złPrice range: 1,414.50 zł through 1,599.00 zł Brutto | 1,150.00 zł NettoSelect options This product has multiple variants. The options may be chosen on the product page -

Wrocław 01
516.60 zł – 639.60 złPrice range: 516.60 zł through 639.60 zł Brutto | 420.00 zł NettoSelect options This product has multiple variants. The options may be chosen on the product page



